$2.17b data centre project approved in Western Sydney

A $2.17 billion data centre development at 2 Glendenning Road, Glendenning, has been approved, clearing the way for one of the larger digital infrastructure projects proposed in Western Sydney.

The State Significant Development will deliver three five-storey data centre buildings across the 10.43-hectare industrial site, with a combined gross floor area of 50,233 sqm. The approved development has a power consumption of approximately 202.4 MW and a maximum building height of 43.2 metres.

The project will be delivered in three stages, with one data centre building constructed during each stage. The exhibited scheme included three internal substations and 97 backup diesel generators to provide standby power during mains outages.

Plans also provide 165 on-site car spaces, including six accessible spaces and 12 electric vehicle charging spaces, together with landscaping and new internal access roads. The facility will operate 24 hours a day, seven days a week.

The development replaces three existing warehouse buildings on the Glendenning Road site, which adjoins Nurragingy Reserve to the east and sits within an established industrial precinct near the M7 Motorway.

The project is expected to generate around 1,076 direct construction jobs and 106 ongoing operational jobs.

Lehr Consultants International (Australia) Pty Ltd is the proponent, with Willowtree Planning leading the planning application and Greenbox Architecture responsible for the architectural design.

The application attracted two public submissions during exhibition, including an objection from Blacktown City Council. Consent was granted by the Department of Planning, Housing and Infrastructure on 14 September 2026.

For more information, search SSD-73761707 on the NSW Planning Portal.

View in Project TrackerView on Planning Portal
Project Snapshot
Project Overview
Application NumberSSD-73761707
Project TitleGlendenning Road Data Centre
Project StatusDetermined
Current SchemeApproved scheme
Current Scheme Date2026-09-14
DecisionApproved
Determination Date14/09/2026
Project TypeData Storage
Address2 Glendenning Road, Glendenning
LGABlacktown
Applicant / DeveloperLEHR CONSULTANTS INTERNATIONAL (AUSTRALIA) PTY LTD
Project Metrics
Site Area104,321 sqm (10.43 ha)
GFA50,233 sqm
Buildings3
Storeys5
Building Height45.3m
Parking165 car | 4 bike
Data Centre Capacity193.60 MW
Jobs1,076 construction / 106 operational
Capital Investment$2.17 billion
Project-specific Metrics
Total Power Capacity MW235 MW
Potable Water Use Ml Per Year49
Backup Generators97
Diesel Fuel Storage Kl2,338
Lithium Ion Battery Rooms6
Battery Mass Kg2,940
Internal Substations3
Ev Charging Spaces12
Project Team
Applicant / ProponentLEHR CONSULTANTS INTERNATIONAL (AUSTRALIA) PTY LTD
Planning / EIS ConsultantWillowtree Planning
ArchitectGreenbox Architecture
Quantity SurveyorTurner & Townsend
Traffic / Transport ConsultantPositive Traffic
Landscape ArchitectGeoscapes
Biodiversity ConsultantBiosis
Acoustic ConsultantPulse White Noise Acoustics

Track NSW State Significant Development every week.

Explore new projects, exhibitions, determinations and other SSD status changes in the interactive Project Tracker.

More project records

Subscribe to Urban Digest Weekly

Subscribe to Urban Digest Weekly to get the latest SSD updates delivered straight to your inbox every Monday.