$77.8m Miranda Seniors Tower Proposed

An amended $77.8 million mixed-use development in Miranda has returned to public exhibition, with plans for a 19-storey seniors housing tower and a new Salvation Army community facility at 23 Kiora Road and 2–6 Willock Avenue.

Formus Miranda is seeking State Significant Development approval for 108 independent living units on the 2,447 sqm site, alongside a 1,500 sqm community facility to be operated by The Salvation Army. The site is owned by The Salvation Army, which has partnered with Formus on the redevelopment.

The amended scheme provides 14,965 sqm of gross floor area, comprising 13,463 sqm of residential space and 1,502 sqm for the community facility. The building would reach 68 metres with an FSR of 6.12:1, while three basement levels would accommodate 151 car spaces — 131 for residents and 20 for The Salvation Army.

The dwelling mix comprises five one-bedroom, 56 two-bedroom, 30 three-bedroom and 17 larger three-bedroom-plus units. Five dwellings would be provided as affordable housing for 15 years and managed by a registered community housing provider.

Resident facilities would include a gym, pool, cinema, library, games and arts and crafts areas, consulting and meeting rooms and flexible communal spaces. A rooftop area would also provide a weather-protected barbecue space and viewing platform, with a total of 575 sqm of landscaped communal open space proposed.

The application represents a significant change from the scheme first exhibited in March 2026. The original proposal sought approval for a 17-storey building containing 116 conventional apartments and the same 1,500 sqm Salvation Army facility. Following discussions with seniors housing providers, the applicant amended the residential component to independent living units, reducing the dwelling count to 108 but adding two storeys to accommodate the larger and more accessible apartment layouts.

A concurrent rezoning is also proposed. The site currently has a maximum building height of 25 metres and FSR of 2:1, while the amended scheme seeks controls of 68 metres and 6.12:1. An earlier planning proposal for the site had sought a 60-metre height limit and FSR of 5.5:1 before the project moved into the Housing Delivery Authority pathway.

The proposal was declared State Significant Development through the HDA process in February 2025. The amended application is currently being re-exhibited from 25 September to 9 October 2026. The NSW Planning Portal currently lists 72 submissions associated with the application.

Turner is the architect, Colliers Urban Planning is the planning consultant and Land+Form is responsible for landscape architecture. The project team also includes McLaren Traffic Engineering, E-LAB Consulting and a range of engineering and environmental consultants.

For further information and exhibition documents, search SSD-80438964 on the NSW Major Projects Planning Portal.

View in Project TrackerView on Planning Portal
Project Snapshot
Project Overview
Application NumberSSD-80438964
Project TitleMixed Use Development 2-6 Willock Ave, 23 Kiora Road, Miranda
Project StatusExhibition
Current SchemeAmended proposal – independent living units
Current Scheme Date2026-09-24
Project TypeHDA Housing
Address23 Kiora Road &Amp; 2-6 Willock Avenue, Miranda
LGASutherland Shire
Applicant / DeveloperFormus Property Pty Ltd
Project Metrics
Site Area2,447 sqm
GFA14,965.40 sqm
Residential GFA13,463.20 sqm
Non-residential GFA1,502.30 sqm
Dwellings108
Independent Living Units108
Affordable Housing5 dwellings | 3%
Storeys19
Building Height68m
Floor Space Ratio6.12:1
Parking151 car
Basement Levels3
Jobs197 construction / 25 operational
Capital Investment$77.8 million
Project-specific Metrics
Dwelling MixOne Bedroom: 5; Two Bedroom: 56; Three Bedroom: 30; Three Plus Bedroom: 17
Salvation Army Car Spaces20
Residential Car Spaces131
Community Facility GFA sqm1,500 sqm
Project Team
Applicant / ProponentFormus Property Pty Ltd
Planning ConsultantColliers Urban Planning
ArchitectTurner Architects

Track NSW State Significant Development every week.

Explore new projects, exhibitions, determinations and other SSD status changes in the interactive Project Tracker.

More project records

Subscribe to Urban Digest Weekly

Subscribe to Urban Digest Weekly to get the latest SSD updates delivered straight to your inbox every Monday.